TSTG was responsible for all material being ordered and all openings being field verified. Fab drawings ranged from exterior storefront, interior storefront, Curtainwall, doors/frames, clearstory, and blast curtain wall. All frames were installed square, level, and plumb and per the instillation instructions. Both the exterior storefronts and curtain walls included working operable in the system. Curtain walls received sunshades on all openings.

Glass was installed in all systems with the proper glazing gaskets. All door hardware was installed on doors per door schedule. Perimeter sealant was installed on all exterior and interior frames. Cleaning and removal of all material off the jobsite was last.